Form for notification of the start of construction. Notice of the start of construction - form and sample

Appendix No. 2
to the Procedure for conducting inspections when
implementation of public
construction supervision and issuance of conclusions
about the conformity of the built ones,
reconstructed, refurbished
capital construction projects
requirements of technical regulations (standards
and rules), other regulatory legal
acts and project documentation
(RD-11-04-2006),
approved by order of the Federal
environmental services.
technological and nuclear supervision
dated December 26, 2006 N 1129
(as amended by Order of Rostechnadzor dated July 14, 2015 N 273)

(Recommended sample) NOTICE N_____ OF THE START OF CONSTRUCTION, RECONSTRUCTION OF A CAPITAL CONSTRUCTION FACILITY ______________________ "___" _________ 20__ (place of compilation) 1. Developer, technical customer ______________________________ (name of the developer, ___________________________________________________________________ technical customer (if there is a technical customer), ___________________________________________________________________ number and date of issue of the certificate of state registration, ___________________________________________________________________ OGRN, TIN, postal details, telephone/fax - for legal entities; ___________________________________________________________________ last name, first name, patronymic of the developer or technical customer, ___________________________________________________________________ passport details, place of residence, telephone/fax - for individuals) 2 . Capital construction object ___________________________________ (name of the object ___________________________________________________________________ capital construction in accordance with the design ___________________________________________________________________ documentation, brief design characteristics, description of the stage ___________________________________________________________________ construction, reconstruction, if a permit is issued for the construction, reconstruction stage) 3. Address (location) of the capital construction object _____ ___________________________________________________________________ ( postal or construction address of the capital construction project) 4. Permit for construction of the capital construction project ___________________________________________________________________ (number and date of issue, ___________________________________________________________________ by whom, validity period) 5. Positive conclusion of the examination of project documentation, if the design documentation of the capital construction project is subject to examination in accordance with the requirements Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) ______________ (number and date of issue, ___________________________________________________________________ issued by) 6. Positive conclusion of the state environmental assessment of project documentation if the design documentation of a capital construction project subject to state environmental assessment ________________________________________ (number and date of issue, __________________________________________________________________ issued by) 7. Start of construction, reconstruction ___________________________ (start date of work) 8. Completion of construction, reconstruction ________________________ (date of completion of work) 9. List of individual entrepreneurs or legal entities carrying out construction, attracted by the developer or technical customer on the basis of an agreement, indicating certificates of admission to a certain type or types of work that affect the safety of capital construction projects, and the names of self-regulatory organizations,

From 08/04/2018, a notification procedure was introduced for informing the authorities about the beginning and completion of the construction of individual residential buildings, garden and country houses.

The interested party (hereinafter referred to as the Developer) sends a notification to the Department of Architecture and Urban Planning, in which he describes in detail what he plans to build. And the authority studies the developer’s intentions and sends him a notification in response, in which he informs whether the construction intentions meet all the requirements or do not comply. If they match, you can build. And if they do not comply, construction cannot be completed until the reasons are eliminated, and the authority is obliged to check whether construction has begun with violations. If started, the registration authority will receive information that the building on the specified land plot cannot be registered. And the state construction supervision body, after identifying the fact of illegal construction, initiates legal proceedings in order to bring the building into compliance with the requirements or, if this is not possible, for demolition.

  • Form Notification of the start of construction work bot
  • Form Notification of completion of construction work
  1. The developer sends a notification to the department about the planned construction. The developer independently indicates in the notification the parameters of the planned facility: number of floors, area of ​​the planned development, setbacks from the boundaries of the land plot, maximum height in meters.
  2. Department within seven working days checks the information specified by the developer for compliance with the maximum parameters of permitted construction, the requirements of current legislation and sends him a notification about the compliance/non-compliance of the planned construction with legal norms.
  3. Not later one month After completion of construction of the house, the developer is required to send a notice of completion to the Department. The information in the notice of completion of construction work is indicated by the developer independently, namely: the information specified in the notice of the start of construction work, information about the parameters of the constructed capital construction project, as well as the technical plan of the capital construction project and a document confirming the fact of payment by the applicant of the state duty for carrying out the state registration of rights.
  4. Department within seven working days checks the information specified in the notice of completion of construction work for compliance of the parameters of the constructed facility with the parameters specified in the notice of the start of construction work and sends a notification to the developer about the compliance/non-compliance of the constructed facility with legal norms.

Entrust the solution of legal issues to specialists

7 978 744 30 11

The Department, issuing a positive conclusion on the conformity of the completion of construction work, independently sends to the rights registration authority statement on state cadastral registration and state registration of rights. The form of such a statement has also not yet been determined.

A significant part of the territories of Sevastopol is located within the boundaries of a historical settlement or place of interest. These boundaries are determined by federal acts. They also established requirements for new construction. These requirements are very strict. It is necessary to keep in mind that Sevastopol is a unique place, in preserving the characteristics of which the country and the entire world community are interested. These features are expressed in the totality of unique landscapes and in the unique character of historical buildings, in a significant number of historical monuments. For this feature, there are also nuances regarding the submission of notifications by developers. If the land plot is located in the zone of such restrictions, the developer must attach a graphic description of the external appearance of the house to the notice of planned construction.

Information from the website of the Department of Architecture and Urban Planning of Sevastopol -

— a document confirming the intention of the developer/customer to begin construction (reconstruction, major repairs of the facility). Headed notice of the start of construction to Rostekhnadzor. We will tell you in this article how it is drawn up, what documents need to be attached to it and in what time frame this should be done.

Structure of the notice of the start of construction, sample of its completion

Upon registration notice of the start of construction(major repairs, reconstruction) should be guided by Appendix No. 2 to the Procedure for conducting inspections when carrying out state supervision and issuing conclusions on the compliance of capital construction projects with technical requirements. regulations, etc. No. 1129 dated December 26, 2006 (this document is easy to find on the official website of Rostechnadzor). Guided by the provisions set out in it, you can independently fill out such a notice indicating the necessary data, the description below can serve as a guide.

So, the notification is formatted as follows:

  1. The name of the document is written in the center of the sheet: “Notice No. __ about the start of construction, reconstruction or major repairs of a capital construction project.”
  2. Below on the left is the place where the document was compiled, and on the right is the date of its preparation.
  3. The first paragraph of the notice reflects information about the developer/customer. Legal persons must indicate their full name, number and date of issue of the state registration certificate, OGRN, TIN, their postal address and contact telephone (fax) number. If the notice is sent to an individual. person, then the full name, basic passport data, place of residence (according to registration), and contact telephone number are indicated.
  4. The second paragraph displays information about the capital construction site on which work is planned (its name and brief design characteristics).
  5. Point 3 is the construction or postal address of the capital construction project.
  6. The fourth paragraph indicates the number of the construction permit (repair, reconstruction) of the capital construction project, information about when and by whom it was issued, and its validity period.
  7. The fifth paragraph indicates the number of the state conclusion. examination of project documentation, the date of its issue and the name of the issuing authority.
  8. Paragraph 6 indicates the start date of construction, reconstruction or major repairs of the capital construction project.
  9. In the seventh paragraph, the developer or customer indicates the completion date of the work.
  10. Below is an exhaustive list of documents that are attached to the notice (it can be found in Article 52 of the Town Planning Code).
  11. This is followed by the signature of the authorized person of the developer/customer with a transcript, date and stamp.

At the bottom there is a place for a receipt note, which is affixed by an official of the state construction supervision body.

Don't know your rights?

Sample of filling out a notice of the start of construction you can find on our website. In addition, in Order No. 1129, which was mentioned earlier, there is a sample construction start notification form.

Download notification form

It should also be noted that from the end of 2015, a wider list of data may be included in the notification. For example, you will need to provide additional information about the individual entrepreneur and legal entity. persons if they are involved by the developer/customer in carrying out construction (repair, restoration) work under the contract. In this case, the persons involved must have a certificate of admission to work that affects the safety of capital construction projects. In this case, it will be necessary to indicate the name of the SRO (self-regulatory organization) of which they are members.

About the documents attached to the notice of the start of construction

Not only a notification must be submitted to Rostekhnadzor. The following must be included with it:

  1. A copy of the building permit (the document must be properly certified).
  2. A complete package of design documentation. It should be noted that if we are talking about obtaining permission not for the entire project as a whole, but only for some part of it, then only the volume of project documentation that is necessary to carry out the corresponding stage of work is submitted.
  3. A copy of the document on the placement of indentation lines from the red lines on the ground (the copy must be properly certified).
  4. Journals (general and special), which reflect the progress of work. They are necessary for organizing registration and accounting.
  5. A certified copy of the expert examination report of the design documentation.

All listed documents must be submitted to Rostechnadzor according to the inventory drawn up by the representative of the developer/customer submitting the notification.

About filing a notice

Notice of the start of construction(major repairs, reconstruction) must be sent by the customer/developer to the state construction supervision authority within a week (i.e., not exceeding 7 working days) before he plans to begin work. Moreover, 2 copies of the document signed by authorized representatives must be sent to Rostechnadzor.

If the specified deadlines are violated, it is possible to bring the customer/developer to administrative liability (Part 2 of Article 9.5 of the Administrative Code). The amount of penalties in this case can range from 100 to 300 thousand rubles.

Greetings, friends! It often happens that we receive requests indicating the construction of some object without a building permit. So, when entering the site, it turns out that the developer has a construction permit, but the developer did not notify the authority exercising regional state construction supervision in accordance with Part 5 of Art. 52 Civil Code of the Russian Federation. And this, you know, is an administrative offense and is punishable by a hefty fine. If you want to start new construction absolutely legally, then read the article carefully.

So, let's talk today about submitting a notice of the start of construction of a capital construction project. Let's get to know him better, so to speak.

What it is

During the construction and reconstruction of many objects, the legislation establishes mandatory state construction supervision over the progress of construction and reconstruction of such objects. Briefly, these are construction projects whose design documentation is subject to examination. And this is established in Art. 49 Civil Code of the Russian Federation.

In accordance with Part 5 of Art. 52 of the Civil Code of the Russian Federation, the developer or technical customer is obliged in advance, but no later than seven working days (notification period) before the start of construction, to submit a notice of the start of construction or reconstruction to the body exercising state construction supervision, as they previously said in GASN.

How to fill out

Below is a sample of a completed notice. And we will consider in more detail the main points for filling it out.

At the top of the sheet “14-04\46-16 dated 05/19/2016” handwritten means the assigned registration number, which was registered on 05/19/2016. By the way, the case number in the state construction supervision body will be the same.

The notice of the start of construction will always be No. 1, since this is the very first notice that is submitted to the State Tax Service.

“Place of preparation” - indicate the city or settlement where the notice was issued. In the same line indicate the date the notice was issued. It may not coincide with the registration date.

In paragraph 1 We indicate the name of the developer or technical customer, the number and date of issue of the state certificate. registration (of the developer’s organization) and further according to the wording.

In the second point We indicate the name of the capital construction project and its brief characteristics.

In the third point We indicate the address of the facility proposed for construction. The address can be specified as a construction address (for example: Cheboksary, Novoyuzhny district, Solnechny microdistrict, position 1.2), or a postal address, if already assigned (for example: Cheboksary, Lenin St., 42).

In general, when filling out a notice, try to take all the data from an existing building permit. The permit is issued mainly by knowledgeable people and the name, address of the object and other data are indicated correctly.

In the fourth point We indicate the number and date of issue of the building permit. Also who issued the permit and its validity period.

In the fifth point We indicate the number and date of issue of the positive expert opinion of the design documentation. If you have several examinations, for example, design documentation is one conclusion, and engineering surveys are a second conclusion, then we indicate both. Also, do not forget to indicate who issued these conclusions.

In the sixth point By analogy with the fifth, we indicate the number and date of issue of the positive conclusion of the state environmental assessment. This item is completed if the specified conclusion is available.

Seventh point We indicate the start of construction of a capital construction project. Do not forget that construction can begin only after seven working days have passed from the date of submission of the notice of the start of construction to the SSN authorities. That is, we draw up the seventh point carefully.

In the eighth point indicate the completion date of construction. We take the date from the construction organization project, where there is an estimate of the construction duration.

In the ninth paragraph You must identify the general contractor you hired for the construction. Also the number of the SRO admission certificate. If you yourself act as a general contractor and developer in one person, then we indicate your organization.

And finally, the tenth point We register all the documents attached to the notice of the start of construction or reconstruction of a capital construction project.

List of documents attached to the notice of the start of construction

What documents are attached to the notice of the start of construction are indicated in Part 5 of Art. 52 Civil Code of the Russian Federation. Namely:

In general, you are required to register a notice even if you do not have the documents attached to it. You can deliver all these documents later. The absence of these documents cannot be a reason for refusing to register a notice. That is, you can notify about the start of construction only with a completed notice in hand.

If you have any questions, feel free to ask them in the comments and subscribe to the blog.

P.p.s. Friends, I would also like to recommend to you "Generator and additional documentation - Generator-ID" from the site ispolnitelnaya.com. The program is so simple and effective that it will save a lot of time. I advise everyone to check it out!!!